Boosting our Green Credentials

In a boost to its green credentials, E.D.Elson’s commission their newly installed solar panel array at their St Albans Branch.

In line with their keen environmental interests and concerns, back in August of 2021, the board of Elson’s decided to invest in the installation of 267 solar panels on the roof of their St Albans main depot. This, in conjunction with the overhaul and encapsulation of an ageing and leaky asbestos containing corrugated cement roof, in order to avoid its removal and thus inevitable ultimate destination of a landfill site, will hopefully help secure a future that will benefit everyone in the future. At peak generating power, the panels will produce up to 99.75kwp, which is more than enough to make the site fully self-sufficient for electricity at those times.